IndaxIndax raises pre-seed from Pear VC & DRF to build the data network for the industrial economyIndaxIndax raises pre-seed from Pear VC & DRF to build the data network for the industrial economyIndaxIndax raises pre-seed from Pear VC & DRF to build the data network for the industrial economyIndaxIndax raises pre-seed from Pear VC & DRF to build the data network for the industrial economyIndaxIndax raises pre-seed from Pear VC & DRF to build the data network for the industrial economyIndaxIndax raises pre-seed from Pear VC & DRF to build the data network for the industrial economy
track@indax.net

CC one email.
Track everything

Hundreds of threads each day. Five people contacted for one answer. CC track@indax.net once. Get it in seconds.

Calculate ROI
SM

Sarah Mitchell Apex Dynamics

PO
toMike Torres (Purchasing)
cctrack@indax.net

PO-4821 — revised ship date?

Mike, customer is asking about the transformer shipment again. Can you check with the supplier on the revised ETA for lines 3-7?

Indax
Indax

PO-4821 lines 3-7: Siemens confirmed ship date Aug 18 via DHL (tracking: 4839201). Packing list attached to thread from Werner on Aug 12.

JO

James Okafor Pacific Controls

Shipping
toLogistics Team
cctrack@indax.net

Container MSCU-7291 — port delay update

We got notice from the freight forwarder that there's a 4-day hold at Long Beach. Need to alert the customer ASAP.

LC

Lisa Chen Meridian Process

Contract
toLegal & Procurement
cctrack@indax.net

MSA renewal — Clause 12 redline

Attached is the redlined MSA from Meridian. They want to modify the liability cap in Clause 12. Need legal review before Thursday.

TR

Tom Raines Horizon MFG

Spec
toEngineering
cctrack@indax.net

Part #HX-440 spec mismatch on delivery

Received parts don't match drawing rev C. Flange diameter is 6.2" but PO specifies 6.5". Need disposition.

Indax
Indax

Spec mismatch confirmed: PO-3918 line 2 references drawing rev C (6.5" flange). Supplier shipped to rev B. Engineering approved rev C on June 3 — thread from Dave R. attached.

RD

Rachel Dunn CoreFab Industries

RFQ
toWerner Braun (Siemens Energy)
cctrack@indax.net

RFQ-2291 — updated BOM pricing needed

Werner, customer revised the scope. We need updated pricing for the motor assembly and cable harness by EOW.

CV

Carlos Vega Atlas Equipment

Invoice
toAccounts Payable
cctrack@indax.net

INV-8834 doesn't match PO line items

Invoice total is $14,200 but our PO only authorized $12,800. Looks like they added a line for expedited freight we didn't approve.

Indax
Indax

Invoice discrepancy: INV-8834 includes $1,400 expedite fee. No approval found in email threads. Original PO-5501 total was $12,800. Recommend requesting credit memo from Atlas.

NP

Nina Patel Vantage Automation

Schedule
toDavid Kim (Project Mgr)
cctrack@indax.net

Re: Conveyor install — schedule slip?

David, our site team says the foundation isn't ready. Are we looking at a 2-week push? Customer needs updated timeline.

DK

David Kim Internal

Query
totrack@indax.net

What's the latest on the Apex transformer PO?

I'm meeting with the customer tomorrow morning and need to know the current ETA. I haven't been on the thread with Siemens.

Indax
Indax

PO-4821 (Apex transformer): Siemens confirmed lines 3-7 ship Aug 18 via DHL. Tracking #4839201. Werner Braun confirmed in thread with Mike Torres on Aug 12.

GH

Greg Holloway Summit Fabrication

PO
toProcurement
cctrack@indax.net

Sole source justification — titanium flanges

Only qualified supplier for the Ti flanges is Summit. Need procurement to sign off on sole source before we can issue the PO.

SM

Sarah Mitchell Apex Dynamics

PO
toMike Torres (Purchasing)
cctrack@indax.net

PO-4821 — revised ship date?

Mike, customer is asking about the transformer shipment again. Can you check with the supplier on the revised ETA for lines 3-7?

Indax
Indax

PO-4821 lines 3-7: Siemens confirmed ship date Aug 18 via DHL (tracking: 4839201). Packing list attached to thread from Werner on Aug 12.

JO

James Okafor Pacific Controls

Shipping
toLogistics Team
cctrack@indax.net

Container MSCU-7291 — port delay update

We got notice from the freight forwarder that there's a 4-day hold at Long Beach. Need to alert the customer ASAP.

LC

Lisa Chen Meridian Process

Contract
toLegal & Procurement
cctrack@indax.net

MSA renewal — Clause 12 redline

Attached is the redlined MSA from Meridian. They want to modify the liability cap in Clause 12. Need legal review before Thursday.

TR

Tom Raines Horizon MFG

Spec
toEngineering
cctrack@indax.net

Part #HX-440 spec mismatch on delivery

Received parts don't match drawing rev C. Flange diameter is 6.2" but PO specifies 6.5". Need disposition.

Indax
Indax

Spec mismatch confirmed: PO-3918 line 2 references drawing rev C (6.5" flange). Supplier shipped to rev B. Engineering approved rev C on June 3 — thread from Dave R. attached.

RD

Rachel Dunn CoreFab Industries

RFQ
toWerner Braun (Siemens Energy)
cctrack@indax.net

RFQ-2291 — updated BOM pricing needed

Werner, customer revised the scope. We need updated pricing for the motor assembly and cable harness by EOW.

CV

Carlos Vega Atlas Equipment

Invoice
toAccounts Payable
cctrack@indax.net

INV-8834 doesn't match PO line items

Invoice total is $14,200 but our PO only authorized $12,800. Looks like they added a line for expedited freight we didn't approve.

Indax
Indax

Invoice discrepancy: INV-8834 includes $1,400 expedite fee. No approval found in email threads. Original PO-5501 total was $12,800. Recommend requesting credit memo from Atlas.

NP

Nina Patel Vantage Automation

Schedule
toDavid Kim (Project Mgr)
cctrack@indax.net

Re: Conveyor install — schedule slip?

David, our site team says the foundation isn't ready. Are we looking at a 2-week push? Customer needs updated timeline.

DK

David Kim Internal

Query
totrack@indax.net

What's the latest on the Apex transformer PO?

I'm meeting with the customer tomorrow morning and need to know the current ETA. I haven't been on the thread with Siemens.

Indax
Indax

PO-4821 (Apex transformer): Siemens confirmed lines 3-7 ship Aug 18 via DHL. Tracking #4839201. Werner Braun confirmed in thread with Mike Torres on Aug 12.

GH

Greg Holloway Summit Fabrication

PO
toProcurement
cctrack@indax.net

Sole source justification — titanium flanges

Only qualified supplier for the Ti flanges is Summit. Need procurement to sign off on sole source before we can issue the PO.

SM

Sarah Mitchell Apex Dynamics

PO
toMike Torres (Purchasing)
cctrack@indax.net

PO-4821 — revised ship date?

Mike, customer is asking about the transformer shipment again. Can you check with the supplier on the revised ETA for lines 3-7?

Indax
Indax

PO-4821 lines 3-7: Siemens confirmed ship date Aug 18 via DHL (tracking: 4839201). Packing list attached to thread from Werner on Aug 12.

JO

James Okafor Pacific Controls

Shipping
toLogistics Team
cctrack@indax.net

Container MSCU-7291 — port delay update

We got notice from the freight forwarder that there's a 4-day hold at Long Beach. Need to alert the customer ASAP.

LC

Lisa Chen Meridian Process

Contract
toLegal & Procurement
cctrack@indax.net

MSA renewal — Clause 12 redline

Attached is the redlined MSA from Meridian. They want to modify the liability cap in Clause 12. Need legal review before Thursday.

TR

Tom Raines Horizon MFG

Spec
toEngineering
cctrack@indax.net

Part #HX-440 spec mismatch on delivery

Received parts don't match drawing rev C. Flange diameter is 6.2" but PO specifies 6.5". Need disposition.

Indax
Indax

Spec mismatch confirmed: PO-3918 line 2 references drawing rev C (6.5" flange). Supplier shipped to rev B. Engineering approved rev C on June 3 — thread from Dave R. attached.

RD

Rachel Dunn CoreFab Industries

RFQ
toWerner Braun (Siemens Energy)
cctrack@indax.net

RFQ-2291 — updated BOM pricing needed

Werner, customer revised the scope. We need updated pricing for the motor assembly and cable harness by EOW.

CV

Carlos Vega Atlas Equipment

Invoice
toAccounts Payable
cctrack@indax.net

INV-8834 doesn't match PO line items

Invoice total is $14,200 but our PO only authorized $12,800. Looks like they added a line for expedited freight we didn't approve.

Indax
Indax

Invoice discrepancy: INV-8834 includes $1,400 expedite fee. No approval found in email threads. Original PO-5501 total was $12,800. Recommend requesting credit memo from Atlas.

NP

Nina Patel Vantage Automation

Schedule
toDavid Kim (Project Mgr)
cctrack@indax.net

Re: Conveyor install — schedule slip?

David, our site team says the foundation isn't ready. Are we looking at a 2-week push? Customer needs updated timeline.

DK

David Kim Internal

Query
totrack@indax.net

What's the latest on the Apex transformer PO?

I'm meeting with the customer tomorrow morning and need to know the current ETA. I haven't been on the thread with Siemens.

Indax
Indax

PO-4821 (Apex transformer): Siemens confirmed lines 3-7 ship Aug 18 via DHL. Tracking #4839201. Werner Braun confirmed in thread with Mike Torres on Aug 12.

GH

Greg Holloway Summit Fabrication

PO
toProcurement
cctrack@indax.net

Sole source justification — titanium flanges

Only qualified supplier for the Ti flanges is Summit. Need procurement to sign off on sole source before we can issue the PO.

Indax

Indax

Nudge
toMike Torres (Purchasing)

Nudge: Siemens hasn't acknowledged PO-4821 line 8

Commitment was due 3 days ago. No reply from Werner in the thread. Last message was your follow-up on Aug 9.

Indax
IndaxAuto-nudge

Siemens has not acknowledged line 8 (cable harness) on PO-4821. Commitment was due Aug 11. Recommend following up with Werner directly.

MS

Mark Sullivan Delta Power Systems

Shipping
toOrder Management
cctrack@indax.net

PO-6102 — partial shipment notification

Shipping lines 1-4 today via FedEx Freight. Lines 5-6 (VFDs) on backorder until Sept 2. Updated ASN attached.

Indax
Indax

PO-6102 update: Lines 1-4 shipped today (FedEx PRO #7291-4401). Lines 5-6 (VFDs) backordered — new ETA Sept 2 per Mark Sullivan's email today.

Indax

Indax

Follow-up
toRachel Dunn (Sales)

Follow-up: RFQ-2291 pricing still pending

Siemens Energy hasn't responded to the updated BOM request sent 5 days ago. Customer deadline is Friday.

Indax
IndaxFollow-up

No response from Werner Braun on RFQ-2291 updated pricing (sent Aug 9). Customer quote deadline is this Friday. Recommend escalating to Siemens account manager.

AL

Amy Lawson ProChem Solutions

Payment
toAccounts Receivable
cctrack@indax.net

Payment status — INV-7720 past due 15 days

Our records show this invoice is now 15 days past due. We confirmed delivery was completed on July 28. Can you provide payment timeline?

SM

Sarah Mitchell Internal

Query
totrack@indax.net

Did Pacific Controls ever confirm the delivery window?

I need to update the customer but I wasn't on the logistics thread. Did anyone get a confirmed date from James?

Indax
Indax

Yes — James Okafor confirmed delivery window for Aug 22 in his thread with the carrier on Aug 10. Customer site contact (building 4 dock) acknowledged.

Indax

Indax

Alert
toJames Okafor (Logistics)

Alert: Delivery window missed — PO-5580

Carrier confirmed delivery attempt failed yesterday (no dock availability). Rescheduled for tomorrow 8 AM. Customer notified.

Indax
IndaxAuto-nudge

PO-5580 delivery failed Aug 13 — dock unavailable at customer site. Rescheduled Aug 15 at 8:00 AM. Carrier: R+L, PRO #091-442871. Customer contact (Jim Hayes) confirmed new window.

DW

Daniel Wright Precision Alloys

Spec
toQuality Team
cctrack@indax.net

MTR certs missing for heat lot #A7-291

We received the material but MTR certs weren't included. Need these before we can release to production. Can supplier resend?

Indax

Indax

Nudge
toCarlos Vega (Ops)

Reminder: Atlas Equipment delivery confirmation needed

Atlas shipped PO-5501 on Aug 10. No receiving confirmation logged. Recommend checking with warehouse team.

Indax
IndaxAuto-nudge

PO-5501 was marked shipped by Atlas on Aug 10 (BOL attached). No receiving confirmation in any thread. Warehouse team hasn't responded to Carlos's email from Aug 12.

SR

Sofia Reyes TechFab MX

Schedule
toSupply Chain
cctrack@indax.net

Re: Lead time extension — stainless housings

Due to raw material delays, we need to push lead time from 6 weeks to 9 weeks for the 316L housings. Apologies for the inconvenience.

Indax

Indax

Nudge
toMike Torres (Purchasing)

Nudge: Siemens hasn't acknowledged PO-4821 line 8

Commitment was due 3 days ago. No reply from Werner in the thread. Last message was your follow-up on Aug 9.

Indax
IndaxAuto-nudge

Siemens has not acknowledged line 8 (cable harness) on PO-4821. Commitment was due Aug 11. Recommend following up with Werner directly.

MS

Mark Sullivan Delta Power Systems

Shipping
toOrder Management
cctrack@indax.net

PO-6102 — partial shipment notification

Shipping lines 1-4 today via FedEx Freight. Lines 5-6 (VFDs) on backorder until Sept 2. Updated ASN attached.

Indax
Indax

PO-6102 update: Lines 1-4 shipped today (FedEx PRO #7291-4401). Lines 5-6 (VFDs) backordered — new ETA Sept 2 per Mark Sullivan's email today.

Indax

Indax

Follow-up
toRachel Dunn (Sales)

Follow-up: RFQ-2291 pricing still pending

Siemens Energy hasn't responded to the updated BOM request sent 5 days ago. Customer deadline is Friday.

Indax
IndaxFollow-up

No response from Werner Braun on RFQ-2291 updated pricing (sent Aug 9). Customer quote deadline is this Friday. Recommend escalating to Siemens account manager.

AL

Amy Lawson ProChem Solutions

Payment
toAccounts Receivable
cctrack@indax.net

Payment status — INV-7720 past due 15 days

Our records show this invoice is now 15 days past due. We confirmed delivery was completed on July 28. Can you provide payment timeline?

SM

Sarah Mitchell Internal

Query
totrack@indax.net

Did Pacific Controls ever confirm the delivery window?

I need to update the customer but I wasn't on the logistics thread. Did anyone get a confirmed date from James?

Indax
Indax

Yes — James Okafor confirmed delivery window for Aug 22 in his thread with the carrier on Aug 10. Customer site contact (building 4 dock) acknowledged.

Indax

Indax

Alert
toJames Okafor (Logistics)

Alert: Delivery window missed — PO-5580

Carrier confirmed delivery attempt failed yesterday (no dock availability). Rescheduled for tomorrow 8 AM. Customer notified.

Indax
IndaxAuto-nudge

PO-5580 delivery failed Aug 13 — dock unavailable at customer site. Rescheduled Aug 15 at 8:00 AM. Carrier: R+L, PRO #091-442871. Customer contact (Jim Hayes) confirmed new window.

DW

Daniel Wright Precision Alloys

Spec
toQuality Team
cctrack@indax.net

MTR certs missing for heat lot #A7-291

We received the material but MTR certs weren't included. Need these before we can release to production. Can supplier resend?

Indax

Indax

Nudge
toCarlos Vega (Ops)

Reminder: Atlas Equipment delivery confirmation needed

Atlas shipped PO-5501 on Aug 10. No receiving confirmation logged. Recommend checking with warehouse team.

Indax
IndaxAuto-nudge

PO-5501 was marked shipped by Atlas on Aug 10 (BOL attached). No receiving confirmation in any thread. Warehouse team hasn't responded to Carlos's email from Aug 12.

SR

Sofia Reyes TechFab MX

Schedule
toSupply Chain
cctrack@indax.net

Re: Lead time extension — stainless housings

Due to raw material delays, we need to push lead time from 6 weeks to 9 weeks for the 316L housings. Apologies for the inconvenience.

Indax

Indax

Nudge
toMike Torres (Purchasing)

Nudge: Siemens hasn't acknowledged PO-4821 line 8

Commitment was due 3 days ago. No reply from Werner in the thread. Last message was your follow-up on Aug 9.

Indax
IndaxAuto-nudge

Siemens has not acknowledged line 8 (cable harness) on PO-4821. Commitment was due Aug 11. Recommend following up with Werner directly.

MS

Mark Sullivan Delta Power Systems

Shipping
toOrder Management
cctrack@indax.net

PO-6102 — partial shipment notification

Shipping lines 1-4 today via FedEx Freight. Lines 5-6 (VFDs) on backorder until Sept 2. Updated ASN attached.

Indax
Indax

PO-6102 update: Lines 1-4 shipped today (FedEx PRO #7291-4401). Lines 5-6 (VFDs) backordered — new ETA Sept 2 per Mark Sullivan's email today.

Indax

Indax

Follow-up
toRachel Dunn (Sales)

Follow-up: RFQ-2291 pricing still pending

Siemens Energy hasn't responded to the updated BOM request sent 5 days ago. Customer deadline is Friday.

Indax
IndaxFollow-up

No response from Werner Braun on RFQ-2291 updated pricing (sent Aug 9). Customer quote deadline is this Friday. Recommend escalating to Siemens account manager.

AL

Amy Lawson ProChem Solutions

Payment
toAccounts Receivable
cctrack@indax.net

Payment status — INV-7720 past due 15 days

Our records show this invoice is now 15 days past due. We confirmed delivery was completed on July 28. Can you provide payment timeline?

SM

Sarah Mitchell Internal

Query
totrack@indax.net

Did Pacific Controls ever confirm the delivery window?

I need to update the customer but I wasn't on the logistics thread. Did anyone get a confirmed date from James?

Indax
Indax

Yes — James Okafor confirmed delivery window for Aug 22 in his thread with the carrier on Aug 10. Customer site contact (building 4 dock) acknowledged.

Indax

Indax

Alert
toJames Okafor (Logistics)

Alert: Delivery window missed — PO-5580

Carrier confirmed delivery attempt failed yesterday (no dock availability). Rescheduled for tomorrow 8 AM. Customer notified.

Indax
IndaxAuto-nudge

PO-5580 delivery failed Aug 13 — dock unavailable at customer site. Rescheduled Aug 15 at 8:00 AM. Carrier: R+L, PRO #091-442871. Customer contact (Jim Hayes) confirmed new window.

DW

Daniel Wright Precision Alloys

Spec
toQuality Team
cctrack@indax.net

MTR certs missing for heat lot #A7-291

We received the material but MTR certs weren't included. Need these before we can release to production. Can supplier resend?

Indax

Indax

Nudge
toCarlos Vega (Ops)

Reminder: Atlas Equipment delivery confirmation needed

Atlas shipped PO-5501 on Aug 10. No receiving confirmation logged. Recommend checking with warehouse team.

Indax
IndaxAuto-nudge

PO-5501 was marked shipped by Atlas on Aug 10 (BOL attached). No receiving confirmation in any thread. Warehouse team hasn't responded to Carlos's email from Aug 12.

SR

Sofia Reyes TechFab MX

Schedule
toSupply Chain
cctrack@indax.net

Re: Lead time extension — stainless housings

Due to raw material delays, we need to push lead time from 6 weeks to 9 weeks for the 316L housings. Apologies for the inconvenience.

Email wasn't built for coordination

Answers live in someone else's inbox. Commitments get buried. Mistakes surface when the customer calls.

Sources: [1] Microsoft Work Trend Index 2025 · [2] Asana Anatomy of Work Index · [3] McKinsey Global Institute · [4] Jitbit · [5] Firstup

200+

emails per person per day[1]

275

interruptions per person per day[1]

60%

of the day goes to coordinating, not executing[2]

20%

of the week spent hunting internal info[3]

5 days

average resolution time[4]

1 in 4

orders disrupted by slow internal replies[5]

The cost of coordination

Plug in your numbers. See what you can recover.

Team size
0
Avg salary (USD)
$0
Emails / person / day
0

Who it's for

Every role loses hours to the same problem: answers trapped in the wrong inbox.

Order Manager

You're the single point of contact for your customer — but you chase 4 internal teams for one answer.

Emails/day for status

45+1

People disrupted per question

40

Time to answer customer

5–8 daysSame day

Ops & Planning

You own the schedule but don't control the suppliers. Delays blindside you because updates live in other inboxes.

Emails/week chasing confirmations

60+0

Delays caught before schedule

~20%90%+

Days before silent commit noticed

7–14<24 hrs

Sales

You need order status before every customer call — but getting it takes longer than the call itself.

Time to answer status question

3–5 days<60 sec

Emails to reconstruct one status

8–121

Selling hours lost to coordination

60–80%<10%

Purchasing

You place orders across dozens of suppliers. Confirmations, acks, and ship dates scatter across inboxes.

Emails to confirm one commitment

112

Unacked POs discovered

At dockIn 48 hrs

Re-answering same question/day

3–5x0

Logistics

Shipments stall on missing docs and silent carriers. You find out at the port, not from your inbox.

Days a missing doc goes unnoticed

14Same day

Status emails from colleagues/week

30+0

Shipments blocked at port/quarter

5–80–1

Order Manager

You're the single point of contact for your customer — but you chase 4 internal teams for one answer.

Emails/day for status

45+1

People disrupted per question

40

Time to answer customer

5–8 daysSame day

Ops & Planning

You own the schedule but don't control the suppliers. Delays blindside you because updates live in other inboxes.

Emails/week chasing confirmations

60+0

Delays caught before schedule

~20%90%+

Days before silent commit noticed

7–14<24 hrs

Sales

You need order status before every customer call — but getting it takes longer than the call itself.

Time to answer status question

3–5 days<60 sec

Emails to reconstruct one status

8–121

Selling hours lost to coordination

60–80%<10%

Purchasing

You place orders across dozens of suppliers. Confirmations, acks, and ship dates scatter across inboxes.

Emails to confirm one commitment

112

Unacked POs discovered

At dockIn 48 hrs

Re-answering same question/day

3–5x0

Logistics

Shipments stall on missing docs and silent carriers. You find out at the port, not from your inbox.

Days a missing doc goes unnoticed

14Same day

Status emails from colleagues/week

30+0

Shipments blocked at port/quarter

5–80–1

Order Manager

You're the single point of contact for your customer — but you chase 4 internal teams for one answer.

Emails/day for status

45+1

People disrupted per question

40

Time to answer customer

5–8 daysSame day

Ops & Planning

You own the schedule but don't control the suppliers. Delays blindside you because updates live in other inboxes.

Emails/week chasing confirmations

60+0

Delays caught before schedule

~20%90%+

Days before silent commit noticed

7–14<24 hrs

Sales

You need order status before every customer call — but getting it takes longer than the call itself.

Time to answer status question

3–5 days<60 sec

Emails to reconstruct one status

8–121

Selling hours lost to coordination

60–80%<10%

Purchasing

You place orders across dozens of suppliers. Confirmations, acks, and ship dates scatter across inboxes.

Emails to confirm one commitment

112

Unacked POs discovered

At dockIn 48 hrs

Re-answering same question/day

3–5x0

Logistics

Shipments stall on missing docs and silent carriers. You find out at the port, not from your inbox.

Days a missing doc goes unnoticed

14Same day

Status emails from colleagues/week

30+0

Shipments blocked at port/quarter

5–80–1

How it works

CC one address. Indax does the rest.

Indax
Sarah
PO-4821
Mike
Siemens
Aug 18
DHL

Memory

Every CC'd thread becomes structured knowledge. People, orders, commitments, and documents — connected automatically.

PO-4821 line 8 — need ack
IndaxMike (Purchasing)

Nudge: Siemens ack overdue — PO-4821 line 8

Commitment was due 3 days ago. No reply from Werner.

Mike (Purchasing)Werner (Siemens)

PO-4821 line 8 — need ack

Werner, still missing acknowledgment on line 8.

Werner (Siemens)Mike (Purchasing)

Re: PO-4821 line 8

Confirmed: cable harness ships Aug 22. SOA attached.

Follow Ups

Nothing slips. Every commitment gets a nudge until it's resolved. Your team stays moving without you chasing.

Daily Digest — 3 items need attention
IndaxMike, Sarah

Daily Digest — 3 items need attention

PO-4821 line 8 overdue. PO-5102 unconfirmed. DHL customs hold.

Mike (Purchasing)Werner (Siemens)

Urgent: PO-4821 customs hold + line 8 ack

Werner, two issues flagged — can you check today?

Sarah (Order Mgr)Customer

PO-5102 — proactive update

Confirming final dates with supplier today. Locked schedule by EOD.

Alerts

A daily digest of what needs attention across all your orders. Costly mistakes caught before they happen.

Where is PO-4821?
Sarah (Order Mgr)track@indax.net

Where is PO-4821?

Customer called. I need an answer in 5 minutes.

IndaxSarah (Order Mgr)

Re: Where is PO-4821?

Lines 3-7 shipped Aug 18 via DHL 4839201. Line 8 confirmed Aug 22.

Sarah (Order Mgr)Customer

Re: PO-4821 status update

Lines 3-7 shipped. Line 8 confirmed for Aug 22. Tracking attached.

Asks

Email a question in plain language. Get the answer in seconds with source citations from threads you're not on.

What people are saying

From teams using Track every day.

I spend most of my day chasing my team for answers. Track is marvelous.

Purchasing Specialist

Process Automation & Controls

Orders get missed. Things get dropped. Customers ask where something's at, and we don't have an immediate answer. Track is a game changer.

Director of Procurement

Chemical Manufacturing

It's a very powerful tool. We're still exploring what we can do with it. I think we can do more and more things.

Sales Manager (Europe)

Process Equipment Manufacturer

We used to spend hours every day just tracking down order statuses. Now it's instant.

Operations Manager

Industrial Distribution

The daily digest alone saves me an hour every morning. I know exactly what needs attention.

Supply Chain Lead

Aerospace Components

I spend most of my day chasing my team for answers. Track is marvelous.

Purchasing Specialist

Process Automation & Controls

Orders get missed. Things get dropped. Customers ask where something's at, and we don't have an immediate answer. Track is a game changer.

Director of Procurement

Chemical Manufacturing

It's a very powerful tool. We're still exploring what we can do with it. I think we can do more and more things.

Sales Manager (Europe)

Process Equipment Manufacturer

We used to spend hours every day just tracking down order statuses. Now it's instant.

Operations Manager

Industrial Distribution

The daily digest alone saves me an hour every morning. I know exactly what needs attention.

Supply Chain Lead

Aerospace Components

I spend most of my day chasing my team for answers. Track is marvelous.

Purchasing Specialist

Process Automation & Controls

Orders get missed. Things get dropped. Customers ask where something's at, and we don't have an immediate answer. Track is a game changer.

Director of Procurement

Chemical Manufacturing

It's a very powerful tool. We're still exploring what we can do with it. I think we can do more and more things.

Sales Manager (Europe)

Process Equipment Manufacturer

We used to spend hours every day just tracking down order statuses. Now it's instant.

Operations Manager

Industrial Distribution

The daily digest alone saves me an hour every morning. I know exactly what needs attention.

Supply Chain Lead

Aerospace Components

I spend most of my day chasing my team for answers. Track is marvelous.

Purchasing Specialist

Process Automation & Controls

Orders get missed. Things get dropped. Customers ask where something's at, and we don't have an immediate answer. Track is a game changer.

Director of Procurement

Chemical Manufacturing

It's a very powerful tool. We're still exploring what we can do with it. I think we can do more and more things.

Sales Manager (Europe)

Process Equipment Manufacturer

We used to spend hours every day just tracking down order statuses. Now it's instant.

Operations Manager

Industrial Distribution

The daily digest alone saves me an hour every morning. I know exactly what needs attention.

Supply Chain Lead

Aerospace Components

Data privacy

Your email is your operation. We treat it that way.

Zero integration

No connection to your mail server or your systems. No access grants, no installs, no infrastructure approvals. You just CC one email address.

Selective memory

Track only sees the emails your team CCs it on. What isn't CC'd doesn't exist for the system. Your team decides what goes in, email by email.

Fully encrypted

All communication travels encrypted. Your emails and documents never move in the clear.

Your data stays yours

We don't train models on your data, we don't sell it, and we don't share it with third parties.

Data Processing Agreement

A DPA is available for every customer, with clear commitments on use, retention, and deletion.

IN PROGRESS

SOC 2 · ISO 27001

Independent audits of security, availability, and confidentiality controls under way.

FAQ
Quick answers.
Each plan gives your organization a set number of emails per month. Every email you send to Indax counts as one. Both agents (Intel and Track) draw from the same pool. One subscription covers your entire team with no per-seat fees.
Indax is a document and material tracking agent that sits on top of your existing email and procurement workflows. It monitors supplier communication, tracks order status, and gives your team real-time visibility across the supply chain — without changing how you work.
Yes. Indax automatically extracts order status updates from email threads, shipping notifications, and supplier confirmations. Your team gets a single view of where every order stands without chasing down updates manually.
Yes. Indax cross-references quoted specs, confirmed orders, and delivery documents to flag discrepancies — wrong quantities, mismatched part numbers, or missing line items — before they become costly problems.
All data is encrypted at rest and in transit. Indax enforces strict access management policies, supports SSO integration, and provides audit logs for compliance. We offer a Data Processing Agreement (DPA) and have SOC 2 Type 1 certification in progress. Your data is never used to train models or shared with third parties.

Backed by

Pear VC
Dorm Room Fund
Indax

Done waiting 5 days
for an answer?

No integration. No dashboard. Just email.

Indax Logo
The industrial data network.