The entire industrial economy, at your fingertips. Email intel@indax.net — ask about any project, market, or contractor.
Marcus Webb Lone Star GC
What solar projects are bidding in Texas right now?
Need a list of active solar projects over $5M in TX. Looking for anything with bid deadlines in the next 30 days.
Found 23 active solar projects in Texas over $5M. Top 3: Permian Basin 48MW (bid deadline Sep 2), Midland Solar Farm 32MW (Sep 8), Abilene Community 18MW (Sep 15). Full list attached.
Indax
Daily Digest — 6 new projects matched your criteria
3 solar, 2 industrial, 1 data center. Permian Basin 48MW moved to final bid stage. New: $12M warehouse in Midland.
6 new matches today. Highlight: Permian Basin Solar (48MW) advanced to final bid — deadline Sep 2. New permit filed: $12M distribution warehouse in Midland, TX. Owner: Amazon.
Rachel Torres Pacific Mechanical
Who's the GC on the Longhorn Data Center project?
We want to bid HVAC on this but can't figure out who's running it. Can you find the GC and PM contact?
Longhorn Data Center (Austin, TX): GC is Turner Construction. PM: David Kim, david.kim@tcco.com. Bid package expected week of Sep 9. Mechanical scope estimated $4.2M.
Kevin Park Summit Controls
What's the spec for the BMS on the Abilene project?
Customer asked me about the controls spec on the Abilene community solar project. Need the BMS requirements and brand preferences.
Abilene Community Solar BMS spec: Schneider EcoStruxure preferred, Modbus TCP/IP, 120 I/O points. Drawing set rev B references section 25 50 00. Spec sheet from engineer (Kimley-Horn) attached.
Indax
Competitor Alert: Apex Controls won the Turner project
Apex Controls was awarded the BMS package on Turner Data Center ($2.1M). They bid 8% below your last proposal on similar scope.
Apex Controls awarded Turner Data Center BMS ($2.1M). Scope: 340 I/O, Tridium Niagara. Their bid was ~8% below market. GC contact who awarded: Jim Holloway, jholloway@tcco.com.
Diana Ruiz ProChem Industries
Find me the maintenance manual for a Grundfos CR 45-3
We have a pump failing on site and need the service manual ASAP. Model is CR 45-3, installed 2019.
Grundfos CR 45-3 service manual (2019 rev): Found in Grundfos Product Center. Key: impeller clearance 0.3mm, seal kit #98513409. Full PDF attached (42 pages). Recommended spare parts list included.
Marcus Webb Lone Star GC
What solar projects are bidding in Texas right now?
Need a list of active solar projects over $5M in TX. Looking for anything with bid deadlines in the next 30 days.
Found 23 active solar projects in Texas over $5M. Top 3: Permian Basin 48MW (bid deadline Sep 2), Midland Solar Farm 32MW (Sep 8), Abilene Community 18MW (Sep 15). Full list attached.
Indax
Daily Digest — 6 new projects matched your criteria
3 solar, 2 industrial, 1 data center. Permian Basin 48MW moved to final bid stage. New: $12M warehouse in Midland.
6 new matches today. Highlight: Permian Basin Solar (48MW) advanced to final bid — deadline Sep 2. New permit filed: $12M distribution warehouse in Midland, TX. Owner: Amazon.
Rachel Torres Pacific Mechanical
Who's the GC on the Longhorn Data Center project?
We want to bid HVAC on this but can't figure out who's running it. Can you find the GC and PM contact?
Longhorn Data Center (Austin, TX): GC is Turner Construction. PM: David Kim, david.kim@tcco.com. Bid package expected week of Sep 9. Mechanical scope estimated $4.2M.
Kevin Park Summit Controls
What's the spec for the BMS on the Abilene project?
Customer asked me about the controls spec on the Abilene community solar project. Need the BMS requirements and brand preferences.
Abilene Community Solar BMS spec: Schneider EcoStruxure preferred, Modbus TCP/IP, 120 I/O points. Drawing set rev B references section 25 50 00. Spec sheet from engineer (Kimley-Horn) attached.
Indax
Competitor Alert: Apex Controls won the Turner project
Apex Controls was awarded the BMS package on Turner Data Center ($2.1M). They bid 8% below your last proposal on similar scope.
Apex Controls awarded Turner Data Center BMS ($2.1M). Scope: 340 I/O, Tridium Niagara. Their bid was ~8% below market. GC contact who awarded: Jim Holloway, jholloway@tcco.com.
Diana Ruiz ProChem Industries
Find me the maintenance manual for a Grundfos CR 45-3
We have a pump failing on site and need the service manual ASAP. Model is CR 45-3, installed 2019.
Grundfos CR 45-3 service manual (2019 rev): Found in Grundfos Product Center. Key: impeller clearance 0.3mm, seal kit #98513409. Full PDF attached (42 pages). Recommended spare parts list included.
Marcus Webb Lone Star GC
What solar projects are bidding in Texas right now?
Need a list of active solar projects over $5M in TX. Looking for anything with bid deadlines in the next 30 days.
Found 23 active solar projects in Texas over $5M. Top 3: Permian Basin 48MW (bid deadline Sep 2), Midland Solar Farm 32MW (Sep 8), Abilene Community 18MW (Sep 15). Full list attached.
Indax
Daily Digest — 6 new projects matched your criteria
3 solar, 2 industrial, 1 data center. Permian Basin 48MW moved to final bid stage. New: $12M warehouse in Midland.
6 new matches today. Highlight: Permian Basin Solar (48MW) advanced to final bid — deadline Sep 2. New permit filed: $12M distribution warehouse in Midland, TX. Owner: Amazon.
Rachel Torres Pacific Mechanical
Who's the GC on the Longhorn Data Center project?
We want to bid HVAC on this but can't figure out who's running it. Can you find the GC and PM contact?
Longhorn Data Center (Austin, TX): GC is Turner Construction. PM: David Kim, david.kim@tcco.com. Bid package expected week of Sep 9. Mechanical scope estimated $4.2M.
Kevin Park Summit Controls
What's the spec for the BMS on the Abilene project?
Customer asked me about the controls spec on the Abilene community solar project. Need the BMS requirements and brand preferences.
Abilene Community Solar BMS spec: Schneider EcoStruxure preferred, Modbus TCP/IP, 120 I/O points. Drawing set rev B references section 25 50 00. Spec sheet from engineer (Kimley-Horn) attached.
Indax
Competitor Alert: Apex Controls won the Turner project
Apex Controls was awarded the BMS package on Turner Data Center ($2.1M). They bid 8% below your last proposal on similar scope.
Apex Controls awarded Turner Data Center BMS ($2.1M). Scope: 340 I/O, Tridium Niagara. Their bid was ~8% below market. GC contact who awarded: Jim Holloway, jholloway@tcco.com.
Diana Ruiz ProChem Industries
Find me the maintenance manual for a Grundfos CR 45-3
We have a pump failing on site and need the service manual ASAP. Model is CR 45-3, installed 2019.
Grundfos CR 45-3 service manual (2019 rev): Found in Grundfos Product Center. Key: impeller clearance 0.3mm, seal kit #98513409. Full PDF attached (42 pages). Recommended spare parts list included.
Indax
Weekly Report — 14 searches, 3 credits remaining
This week: 14 queries, 6 project briefs generated, 2 contact lookups. You have 3 credits left until Monday.
Weekly summary: 14 searches performed, 6 project briefs, 2 contact lookups, 1 competitor alert triggered. Credits used: 12/15. Resets Monday. Top query: solar projects TX.
Tom Nguyen Vantage Electric
Pre-call brief: meeting with Crusoe Energy tomorrow
I have a meeting with Crusoe Energy at 9 AM about their Abilene facility. What do I need to know?
Crusoe Energy (Abilene): $180M bitcoin mining facility, 200MW load. Key contact: Taylor Slack, Sr. Construction Mgr. Current phase: site prep. Electrical scope not yet awarded. Last permit: May 2024.
Indax
Follow-up: Did you reach out to Crusoe Energy?
You had a meeting with Taylor Slack on Monday. No follow-up email detected in your threads. Recommend sending a proposal recap.
No follow-up detected after your Crusoe Energy meeting (Mon Aug 11). Taylor Slack hasn't received a proposal recap. Recommend sending today — bid window closes in 12 days.
Sara Lopez Atlas Fabrication
Who are my competitors on industrial HVAC in DFW?
Need to understand who else is bidding mechanical work in Dallas-Fort Worth. Specifically industrial/warehouse HVAC.
Top 5 industrial HVAC contractors in DFW by permit volume: 1) TD Industries (42 permits), 2) Comfort Systems (38), 3) Apex Mechanical (27), 4) Maxair (19), 5) Atlas Fabrication (12 — you). TD won 3 of the last 5 warehouse projects.
Indax
Alert: New $8M chemical plant permit — matches your profile
ProChem Industries typically bids piping on chemical facilities. New permit filed: $8M expansion at Dow Freeport. Mechanical scope TBD.
New permit: Dow Chemical Freeport TX, $8M expansion. Scope includes process piping (your specialty). GC: Jacobs Engineering. PM not yet assigned. Bid package expected Oct 1. Want a brief?
Indax
Nudge: Have you activated on the Amazon warehouse lead?
The $12M Amazon warehouse in Midland was flagged 5 days ago. No outreach detected to the GC (Hensel Phelps). Deadline approaching.
Amazon Midland warehouse ($12M) flagged Aug 9. GC: Hensel Phelps. No outreach from you detected. Mechanical bid deadline est. Sep 20. Contact: Mike Torres, mtorres@henselphelps.com.
Jason Cole Meridian Power
What deals has Apex Controls won in the last 6 months?
They keep beating us. I want to understand their win rate and which GCs they're working with.
Apex Controls last 6 months: 8 awards, total $14.2M. Top GCs: Turner (3 projects), Hensel Phelps (2), McCarthy (2). Average bid was 6-9% below market. Strongest in data center BMS. Full breakdown attached.
Indax
Weekly Report — 14 searches, 3 credits remaining
This week: 14 queries, 6 project briefs generated, 2 contact lookups. You have 3 credits left until Monday.
Weekly summary: 14 searches performed, 6 project briefs, 2 contact lookups, 1 competitor alert triggered. Credits used: 12/15. Resets Monday. Top query: solar projects TX.
Tom Nguyen Vantage Electric
Pre-call brief: meeting with Crusoe Energy tomorrow
I have a meeting with Crusoe Energy at 9 AM about their Abilene facility. What do I need to know?
Crusoe Energy (Abilene): $180M bitcoin mining facility, 200MW load. Key contact: Taylor Slack, Sr. Construction Mgr. Current phase: site prep. Electrical scope not yet awarded. Last permit: May 2024.
Indax
Follow-up: Did you reach out to Crusoe Energy?
You had a meeting with Taylor Slack on Monday. No follow-up email detected in your threads. Recommend sending a proposal recap.
No follow-up detected after your Crusoe Energy meeting (Mon Aug 11). Taylor Slack hasn't received a proposal recap. Recommend sending today — bid window closes in 12 days.
Sara Lopez Atlas Fabrication
Who are my competitors on industrial HVAC in DFW?
Need to understand who else is bidding mechanical work in Dallas-Fort Worth. Specifically industrial/warehouse HVAC.
Top 5 industrial HVAC contractors in DFW by permit volume: 1) TD Industries (42 permits), 2) Comfort Systems (38), 3) Apex Mechanical (27), 4) Maxair (19), 5) Atlas Fabrication (12 — you). TD won 3 of the last 5 warehouse projects.
Indax
Alert: New $8M chemical plant permit — matches your profile
ProChem Industries typically bids piping on chemical facilities. New permit filed: $8M expansion at Dow Freeport. Mechanical scope TBD.
New permit: Dow Chemical Freeport TX, $8M expansion. Scope includes process piping (your specialty). GC: Jacobs Engineering. PM not yet assigned. Bid package expected Oct 1. Want a brief?
Indax
Nudge: Have you activated on the Amazon warehouse lead?
The $12M Amazon warehouse in Midland was flagged 5 days ago. No outreach detected to the GC (Hensel Phelps). Deadline approaching.
Amazon Midland warehouse ($12M) flagged Aug 9. GC: Hensel Phelps. No outreach from you detected. Mechanical bid deadline est. Sep 20. Contact: Mike Torres, mtorres@henselphelps.com.
Jason Cole Meridian Power
What deals has Apex Controls won in the last 6 months?
They keep beating us. I want to understand their win rate and which GCs they're working with.
Apex Controls last 6 months: 8 awards, total $14.2M. Top GCs: Turner (3 projects), Hensel Phelps (2), McCarthy (2). Average bid was 6-9% below market. Strongest in data center BMS. Full breakdown attached.
Indax
Weekly Report — 14 searches, 3 credits remaining
This week: 14 queries, 6 project briefs generated, 2 contact lookups. You have 3 credits left until Monday.
Weekly summary: 14 searches performed, 6 project briefs, 2 contact lookups, 1 competitor alert triggered. Credits used: 12/15. Resets Monday. Top query: solar projects TX.
Tom Nguyen Vantage Electric
Pre-call brief: meeting with Crusoe Energy tomorrow
I have a meeting with Crusoe Energy at 9 AM about their Abilene facility. What do I need to know?
Crusoe Energy (Abilene): $180M bitcoin mining facility, 200MW load. Key contact: Taylor Slack, Sr. Construction Mgr. Current phase: site prep. Electrical scope not yet awarded. Last permit: May 2024.
Indax
Follow-up: Did you reach out to Crusoe Energy?
You had a meeting with Taylor Slack on Monday. No follow-up email detected in your threads. Recommend sending a proposal recap.
No follow-up detected after your Crusoe Energy meeting (Mon Aug 11). Taylor Slack hasn't received a proposal recap. Recommend sending today — bid window closes in 12 days.
Sara Lopez Atlas Fabrication
Who are my competitors on industrial HVAC in DFW?
Need to understand who else is bidding mechanical work in Dallas-Fort Worth. Specifically industrial/warehouse HVAC.
Top 5 industrial HVAC contractors in DFW by permit volume: 1) TD Industries (42 permits), 2) Comfort Systems (38), 3) Apex Mechanical (27), 4) Maxair (19), 5) Atlas Fabrication (12 — you). TD won 3 of the last 5 warehouse projects.
Indax
Alert: New $8M chemical plant permit — matches your profile
ProChem Industries typically bids piping on chemical facilities. New permit filed: $8M expansion at Dow Freeport. Mechanical scope TBD.
New permit: Dow Chemical Freeport TX, $8M expansion. Scope includes process piping (your specialty). GC: Jacobs Engineering. PM not yet assigned. Bid package expected Oct 1. Want a brief?
Indax
Nudge: Have you activated on the Amazon warehouse lead?
The $12M Amazon warehouse in Midland was flagged 5 days ago. No outreach detected to the GC (Hensel Phelps). Deadline approaching.
Amazon Midland warehouse ($12M) flagged Aug 9. GC: Hensel Phelps. No outreach from you detected. Mechanical bid deadline est. Sep 20. Contact: Mike Torres, mtorres@henselphelps.com.
Jason Cole Meridian Power
What deals has Apex Controls won in the last 6 months?
They keep beating us. I want to understand their win rate and which GCs they're working with.
Apex Controls last 6 months: 8 awards, total $14.2M. Top GCs: Turner (3 projects), Hensel Phelps (2), McCarthy (2). Average bid was 6-9% below market. Strongest in data center BMS. Full breakdown attached.
Industrial news and public records. Monitored 24/7.
Tracked across the US
Across 22 states
States Indax now covers
New Source Review Air Permit
Longhorn Data Center — Abilene, TX
From teams using Intel every day.
“It's like a Bloomberg terminal, for industrials, in your email. You can do a lot of things with it.”
Independent Consultant
Food & Beverage Equipment (30 years experience)
“I asked Intel about the market for conveyors and my competition. It came back with active permits, new project notices, and real-time activity in that market. Unbelievable.”
President & Owner
Process Equipment Manufacturer
“We used to pay $50K/year for lead lists that were 6 months stale. Intel gives us real-time project data for a fraction of the cost.”
VP of Sales
Industrial Controls
“I asked who my competitors were winning deals from. Got a full breakdown in 30 seconds. That used to take weeks of research.”
Business Development Director
Mechanical Contracting
“The pre-call briefs are incredible. I walk into every meeting knowing more about the project than the customer expects.”
Regional Sales Manager
Process Equipment
“It's like a Bloomberg terminal, for industrials, in your email. You can do a lot of things with it.”
Independent Consultant
Food & Beverage Equipment (30 years experience)
“I asked Intel about the market for conveyors and my competition. It came back with active permits, new project notices, and real-time activity in that market. Unbelievable.”
President & Owner
Process Equipment Manufacturer
“We used to pay $50K/year for lead lists that were 6 months stale. Intel gives us real-time project data for a fraction of the cost.”
VP of Sales
Industrial Controls
“I asked who my competitors were winning deals from. Got a full breakdown in 30 seconds. That used to take weeks of research.”
Business Development Director
Mechanical Contracting
“The pre-call briefs are incredible. I walk into every meeting knowing more about the project than the customer expects.”
Regional Sales Manager
Process Equipment
“It's like a Bloomberg terminal, for industrials, in your email. You can do a lot of things with it.”
Independent Consultant
Food & Beverage Equipment (30 years experience)
“I asked Intel about the market for conveyors and my competition. It came back with active permits, new project notices, and real-time activity in that market. Unbelievable.”
President & Owner
Process Equipment Manufacturer
“We used to pay $50K/year for lead lists that were 6 months stale. Intel gives us real-time project data for a fraction of the cost.”
VP of Sales
Industrial Controls
“I asked who my competitors were winning deals from. Got a full breakdown in 30 seconds. That used to take weeks of research.”
Business Development Director
Mechanical Contracting
“The pre-call briefs are incredible. I walk into every meeting knowing more about the project than the customer expects.”
Regional Sales Manager
Process Equipment
“It's like a Bloomberg terminal, for industrials, in your email. You can do a lot of things with it.”
Independent Consultant
Food & Beverage Equipment (30 years experience)
“I asked Intel about the market for conveyors and my competition. It came back with active permits, new project notices, and real-time activity in that market. Unbelievable.”
President & Owner
Process Equipment Manufacturer
“We used to pay $50K/year for lead lists that were 6 months stale. Intel gives us real-time project data for a fraction of the cost.”
VP of Sales
Industrial Controls
“I asked who my competitors were winning deals from. Got a full breakdown in 30 seconds. That used to take weeks of research.”
Business Development Director
Mechanical Contracting
“The pre-call briefs are incredible. I walk into every meeting knowing more about the project than the customer expects.”
Regional Sales Manager
Process Equipment
Backed by
